Penang LRT Mutiara Line

From alignment and stations — all about the CMC1 package in one place.

PROJECT INFORMATION

Penang’s first light rail transit line

The Mutiara Line is Penang Island’s inaugural LRT. The CMC1 package covers an elevated, fully electric corridor running from Silicon Island to Komtar, connecting key population, employment and travel hubs across Penang.

Designed for reliability, accessibility and low-carbon operation, it forms the backbone of a future-ready public transport network for the island.

0 km

Alignment (Silicon Island to Komtar)

0 +1

Stations (incl. 1 provision station)

0 min

Silicon Island to Komtar

0

Interchange stations (Komtar & Macallum)

INTERACTIVE SHOWCASE & VIDEOS

Explore the line in 3D

Alignment flythrough, traffic-management walkthroughs and periodical construction-progress films.

 

PROJECT BENEFITS

Designed for the future

Alleviate traffic congestion

Shifting journeys onto reliable rail eases pressure on the island’s busiest roads.

Enhance connectivity

Linking Komtar, Silicon Island and key hubs into one seamless network.

Affordable & safe travel

Accessible, grade-separated transit that’s safe and priced for everyday use.

Encourage economic growth

Better mobility unlocks investment, tourism and activity along the corridor.

Green transportation

Fully electric operation cuts emissions and supports a low-carbon Penang.

Job creation

Thousands of roles across construction and operation, with local participation.

TECHNICAL & KEY FEATURES

Engineered for Penang Island

Fully elevated viaduct

Grade-separated alignment keeps trains clear of road traffic for safe, punctual journeys.

Driverless automation

Modern signalling and automated operation deliver high frequency and reliability.

Step-free accessibility

Lifts, level boarding and tactile guidance make every station inclusive.

Energy-efficient rolling stock

Regenerative braking and lightweight trains cut energy use across the network.

Integrated mobility

Designed to connect with bus, ferry and active-travel links across Penang.

Resilient & safe

Built to stringent safety and structural standards for decades of service.

CMC1 PACKAGE · BY THE NUMBERS

The scale of the first segment

2025 – Q2 2031 (Practical Completion)

0

Total borepiles

0

Total piers

0

Portals

0

Long spans (75–110m)

0

Special spans

0

Double-Track SBGs

0

Single-Track SBGs

Approx.
0 m

Marine viaduct

Approx.
0 acres

Silicon Island depot

Approx.
0 m

Average viaduct height (from the ground)

Track elements: 6,139 double-track & 2,645 single-track SBGs

• 7 special spans

• Marine viaduct, depot area & average viaduct height — to be confirmed

PROGRESS & DRONE SHOTS

Watch it take shape

As of November 2026

Komtar

Penang International Airport

FIZ North

Permatang Damar Laut

Bandar Sri Pinang

Spurline to the cross-strait marine viaduct (near Macallum station)

SIGNIFICANT EVENTS

Milestones along the way

CONSTRUCTION TIMELINE

From groundbreaking to first ride